BONANZA SOLAR
Type
Entity Briefing
Entity
BONANZA SOLAR
Generated
2026-10-13T03:58:00.905Z

Briefing on BONANZA SOLAR

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
600 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2028-09-30
Proposed COD
C12
Queue phase
Briefing/projectactive

BONANZA SOLAR is a 600 MW Solar+Battery project in Nevada, currently active.

The reported queue phase is C12. Proposed COD is 2028-09-30.

Queue ID
CAISO-1649
Location
Clark, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Innovation Substation 230 kV

What stands out

1

BONANZA SOLAR is a 600 MW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C12; proposed COD is 2028-09-30.

3

Latest linked story: “US Clears 700 MW Solar + 700 MW BESS Project In Nevada” (TaiyangNews, 2024-09-12).

Market and operating context

Queue date
2019-04-15
Proposed COD
2028-09-30
IA status
IA Executed
Study phase
C12
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BONANZA SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1649
LocationClark, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionInnovation Substation 230 kV
Queue date2019-04-15
Proposed COD2028-09-30
IA statusIA Executed