Briefing/projectactive
BONANZA SOLAR is a 600 MW Solar+Battery project in Nevada, currently active.
The reported queue phase is C12. Proposed COD is 2028-09-30.
- Queue ID
- CAISO-1649
- Location
- Clark, Nevada
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Innovation Substation 230 kV
What stands out
1
BONANZA SOLAR is a 600 MW Solar+Battery project in Nevada with status active.
2
The reported queue phase is C12; proposed COD is 2028-09-30.
3
Latest linked story: “US Clears 700 MW Solar + 700 MW BESS Project In Nevada” (TaiyangNews, 2024-09-12).
Market and operating context
- Queue date
- 2019-04-15
- Proposed COD
- 2028-09-30
- IA status
- IA Executed
- Study phase
- C12
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.