Query
Bluebonnet Trail Solar
Type
Entity Briefing
Entity
Bluebonnet Trail Solar
Generated
2026-10-20T00:51:48.173Z

Briefing on Bluebonnet Trail Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-09-19
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bluebonnet Trail Solar is a 151 MW Solar project in Texas, currently active.

Bluebonnet trail solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-19.

Queue ID
ERCOT-27INR0417
Location
Ellis, Texas
Technology
Solar
Developer
Bluebonnet trail solar LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5

What stands out

1

Bluebonnet Trail Solar is a 151 MW Solar project in Texas with status active.

2

Bluebonnet trail solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-19.

Market and operating context

Queue date
2024-12-19
Proposed COD
2028-09-19
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bluebonnet Trail Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0417
LocationEllis, Texas
TechnologySolar
DeveloperBluebonnet trail solar LLC
Market / regionERCOT
Point of interconnectionTap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5
Queue date2024-12-19
Proposed COD2028-09-19