Blue Summit II Storage is a 150 MW Batteries asset in ERCOT (Texas), currently Operating.
Blue Summit II Storage is reported in Texas since 2026 under Blue Summit II Storage, LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Wilbarger, Texas
- Technology
- Batteries
- Owner / parent
- Blue Summit II Storage, LLC
- Operator
- Blue Summit II Storage, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 68456
What stands out
Blue Summit II Storage is a 150 MW Batteries asset in Texas with status Operating.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Denton invests in clean energy with new wind and battery storage projects, as city’s costs and demand go up” (KERA News, 2025-10-02).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #132 of 344
- National rank
- #278 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.