150 MW BESS operating in Wilbarger, TX
150 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2026
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
34.2937, -99.3687
County
Wilbarger, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Blue Summit II Storage, LLC | — | — |
| Owner(s) | Blue Summit II Storage, LLC | — | — |
| Status | Operating | — | — |
Blue Summit II Storage is a 150 MW battery energy storage system located in Wilbarger County, Texas. The plant is owned and operated by Blue Summit II Storage, LLC. It consists of a single generator utilizing batteries as its primary fuel source, designated by the code "MWH". The facility operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region.
Blue Summit II Storage ranks as the 166th largest power plant in Texas out of 224 facilities and 396th nationally out of 514. The plant has been the subject of 10 news articles, with coverage focusing on grid-related topics, industry trends, regulatory matters, and business deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Grid Substation (assumed)
transmission · 345 kV · 0.3 km · nearest
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $204.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Blue Summit Wind Substation · 345 kV
Substation Distance
< 10 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesBattery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.