Blue Summit Energy Storage is a 100 MW Wind+Battery project in Texas, currently active.
NextEra Energy Interconnection Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-03.
- Queue ID
- ERCOT-25INR0492
- Location
- Wilbarger, Texas
- Technology
- Wind+Battery
- Developer
- NextEra Energy Interconnection Holdings, LLC
- Market / region
- ERCOT
- Point of interconnection
- 61001 JIM TREECE 345kV
What stands out
Blue Summit Energy Storage is a 100 MW Wind+Battery project in Texas with status active.
NextEra Energy Interconnection Holdings, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-04-03.
Latest linked story: “Denton invests in clean energy with new wind and battery storage projects, as city’s costs and demand go up” (KERA News, 2025-10-02).
Market and operating context
- Queue date
- 2023-10-20
- Proposed COD
- 2026-04-03
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.