Query
Blue Summit Energy Storage
Type
Entity Briefing
Entity
Blue Summit Energy Storage
Generated
2026-10-19T23:09:22.326Z

Briefing on Blue Summit Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Wind+Battery
Technology
ERCOT
Market / region
2026-04-03
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Blue Summit Energy Storage is a 100 MW Wind+Battery project in Texas, currently active.

NextEra Energy Interconnection Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-03.

Queue ID
ERCOT-25INR0492
Location
Wilbarger, Texas
Technology
Wind+Battery
Developer
NextEra Energy Interconnection Holdings, LLC
Market / region
ERCOT
Point of interconnection
61001 JIM TREECE 345kV

What stands out

1

Blue Summit Energy Storage is a 100 MW Wind+Battery project in Texas with status active.

2

NextEra Energy Interconnection Holdings, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-04-03.

4

Latest linked story: “Denton invests in clean energy with new wind and battery storage projects, as city’s costs and demand go up” (KERA News, 2025-10-02).

Market and operating context

Queue date
2023-10-20
Proposed COD
2026-04-03
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Blue Summit Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0492
LocationWilbarger, Texas
TechnologyWind+Battery
DeveloperNextEra Energy Interconnection Holdings, LLC
Market / regionERCOT
Point of interconnection61001 JIM TREECE 345kV
Queue date2023-10-20
Proposed COD2026-04-03