Briefing/projectactive
Blue Bird Solar is a 773 MW Solar project in Texas, currently active.
Gigawatt Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-15.
- Queue ID
- ERCOT-24INR0075
- Location
- Johnson, Texas
- Technology
- Solar
- Developer
- Gigawatt Solar
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch
What stands out
1
Blue Bird Solar is a 773 MW Solar project in Texas with status active.
2
Gigawatt Solar is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-12-15.
4
Latest linked story: “Major U.S. bank signs $140 million tax equity deal for Louisiana solar project” (pv magazine USA, 2024-03-14).
Market and operating context
- Queue date
- 2021-11-10
- Proposed COD
- 2028-12-15
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.