Query
Blue Bird Solar
Type
Entity Briefing
Entity
Blue Bird Solar
Generated
2026-10-19T23:04:20.669Z

Briefing on Blue Bird Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
773 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-12-15
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Blue Bird Solar is a 773 MW Solar project in Texas, currently active.

Gigawatt Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-15.

Queue ID
ERCOT-24INR0075
Location
Johnson, Texas
Technology
Solar
Developer
Gigawatt Solar
Market / region
ERCOT
Point of interconnection
tap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch

What stands out

1

Blue Bird Solar is a 773 MW Solar project in Texas with status active.

2

Gigawatt Solar is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-12-15.

4

Latest linked story: “Major U.S. bank signs $140 million tax equity deal for Louisiana solar project” (pv magazine USA, 2024-03-14).

Market and operating context

Queue date
2021-11-10
Proposed COD
2028-12-15
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Blue Bird Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0075
LocationJohnson, Texas
TechnologySolar
DeveloperGigawatt Solar
Market / regionERCOT
Point of interconnectiontap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch
Queue date2021-11-10
Proposed COD2028-12-15