Query
Blossom Solar growth signals — PPAs, construction, new projects
Type
Entity Briefing
Entity
Cherry Blossom Solar
ISO/RTO
isone
Generated
2026-10-11T10:21:01.883Z

Briefing on Cherry Blossom Solar

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
Southeast
Market / region
2023-06-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cherry Blossom Solar is a 150 MW Solar+Battery project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2023-06-15.

Queue ID
GTC-GI-142
Location
Twiggs, Georgia
Technology
Solar+Battery
Market / region
Southeast
Point of interconnection
Danville 115 kV Substation

What stands out

1

Cherry Blossom Solar is a 150 MW Solar+Battery project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2023-06-15.

Market and operating context

Queue date
2020-08-13
Proposed COD
2023-06-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cherry Blossom Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-142
LocationTwiggs, Georgia
TechnologySolar+Battery
Market / regionSoutheast
Point of interconnectionDanville 115 kV Substation
Queue date2020-08-13
Proposed COD2023-06-15
IA statusFacility Study