Cherry Blossom Solar (GTC-GI-142) — Project Summary

Queue ID
GTC-GI-142
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Twiggs, GA
Region
Southeast
Developer
IA Status
Facility Study

Cherry Blossom Solar

GTC-GI-142BetaActiveSolarBatteryGTCLBNL

150 MW hybrid in Twiggs, GA · In queue since August 2020 · Proposed COD June 2023

BA: SOCONERC: SERCRC: SOCO

150 MW

Capacity

1

Components

Solar

5y 11m

In Queue

Facility Study

IA Phase

COD target: 2023

Interconnection

Total Duration

2y 10m

Schedule

37 months past proposed COD

Facilities Study50%
Queue EntryAug 13, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-15

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2023-06-15
From queue filing
Developer
Status
Active
Active — marked operational in LBNL data as of proposed 2023 COD, though no public commissioning announcement found
Financing
Unannounced
Key milestones
COD targetJun 15, 2023Most recent

Proposed commercial operation date per LBNL queue filing

About

Cherry Blossom Solar is a proposed 150 MW hybrid solar and battery energy storage project located in Twiggs County, Georgia. The project is listed in the Georgia Transmission (GTC) interconnection queue as queue ID GTC-GI-142, with an entry date of August 13, 2020. The proposed commercial operation date is June 15, 2023, and the project's interconnection agreement status is currently in the Facility Study phase.

The development project consists of 150 MW of solar photovoltaic generation. Cherry Blossom Solar has been mentioned in recent news coverage related to development activities.

Generated from interconnection queue and public data sources

Development Risk

Realization history for this asset — final cost vs plan, COD slip vs original date, and construction duration vs cohort. Retrospective context for the operating risk view above. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

Final cost vs plan
COD vs original date
Construction duration vs cohort
Project Details

State

GA

County

Twiggs

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Danville 115 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating risk view for this asset — climate hazards across its remaining operating life, observed generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — 10-year P50 trajectory accounting for degradation, observed curtailment, and market conditions, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Degradation-adjusted CF
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this asset — 10-year cashflow projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Cherry Blossom Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.