Blackcat Storage is a 201 MW Battery project in Texas, currently active.
Matagorda ESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-26INR0376
- Location
- Matagorda, Texas
- Technology
- Battery
- Developer
- Matagorda ESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- 138kV Blackcat Substation (#80124)
What stands out
1
Blackcat Storage is a 201 MW Battery project in Texas with status active.
2
Matagorda ESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-31.
4
Latest linked story: “Elon Musk’s Tesla building giant battery to plug into Texas grid” (Al Jazeera, 2021-03-08).
Market and operating context
- Queue date
- 2024-01-11
- Proposed COD
- 2027-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters