Briefing on Blackcat Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Blackcat Storage is a 201 MW Battery project in Texas, currently active.

Matagorda ESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.

Queue ID
ERCOT-26INR0376
Location
Matagorda, Texas
Technology
Battery
Developer
Matagorda ESS, LLC
Market / region
ERCOT
Point of interconnection
138kV Blackcat Substation (#80124)

What stands out

1

Blackcat Storage is a 201 MW Battery project in Texas with status active.

2

Matagorda ESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-31.

4

Latest linked story: “Elon Musk’s Tesla building giant battery to plug into Texas grid” (Al Jazeera, 2021-03-08).

Market and operating context

Queue date
2024-01-11
Proposed COD
2027-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Blackcat Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0376
LocationMatagorda, Texas
TechnologyBattery
DeveloperMatagorda ESS, LLC
Market / regionERCOT
Point of interconnection138kV Blackcat Substation (#80124)
Queue date2024-01-11
Proposed COD2027-12-31