Briefing/projectactive
Black Mountain Somervell Gas Combined is a 495 MW Gas project in Texas, currently active.
Fort Worth Power Core LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-28.
- Queue ID
- ERCOT-27INR0497
- Location
- Somervell, Texas
- Technology
- Gas
- Developer
- Fort Worth Power Core LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap Comanche Peak SES Substation (#1900) to Johnson Switch (#1902) 345kV Line
What stands out
1
Black Mountain Somervell Gas Combined is a 495 MW Gas project in Texas with status active.
2
Fort Worth Power Core LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-09-28.
Market and operating context
- Queue date
- 2025-04-21
- Proposed COD
- 2029-09-28
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.