Briefing/projectactive
Bexar Martinez BESS is a 10 MW Battery project in ERCOT, currently active.
Bexar Martinez LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-08-05.
- Queue ID
- ERCOT-26INR0702
- Technology
- Battery
- Developer
- Bexar Martinez LLC
- Market / region
- ERCOT
- Point of interconnection
- TSP Station Name: Martinez_x000D_ TSP Station Code: C5_x000D_ Load Name / Load Transformer Name: T3_x000D_ Bus #: PTI Bus Number: 5294_x000D_ Voltage (Transmission level kV): 138_x000D_ Node (associated w/ load/load XFMR in NMMS): C5349100111-F
What stands out
1
Bexar Martinez BESS is a 10 MW Battery project with status active.
2
Bexar Martinez LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2026-08-05.
Market and operating context
- Queue date
- 2025-09-14
- Proposed COD
- 2026-08-05
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.