Bessie Storage is a 211 MW Battery project in Texas, currently active.
Bessie Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-28.
- Queue ID
- ERCOT-23INR0455
- Location
- Starr, Texas
- Technology
- Battery
- Developer
- Bessie Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Charly Egner Substation Tap 345kV 80355 Del Sol - 80368 LV4 Bridge
What stands out
Bessie Storage is a 211 MW Battery project in Texas with status active.
Bessie Energy Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2029-09-28.
Latest linked story: “Battery storage is a key piece of California's clean energy transition. But there's a problem with fires” (Los Angeles Times, 2023-10-12).
Market and operating context
- Queue date
- 2022-02-21
- Proposed COD
- 2029-09-28
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.