Briefing/projectactive
Berryman Road Storage is a 155 MW Battery project in Texas, currently active.
Horizon Energy Storage Greenfield Project Holdings LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2031-08-31.
- Queue ID
- ERCOT-28INR0373
- Location
- Archer, Texas
- Technology
- Battery
- Developer
- Horizon Energy Storage Greenfield Project Holdings LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 1424# Bowman Substation - 11525# Short grass Substation
What stands out
1
Berryman Road Storage is a 155 MW Battery project in Texas with status active.
2
Horizon Energy Storage Greenfield Project Holdings LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2031-08-31.
Market and operating context
- Queue date
- 2025-06-05
- Proposed COD
- 2031-08-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.