Query
Beacon Storage
Type
Entity Briefing
Entity
Beacon Storage
Generated
2026-10-19T04:46:04.862Z

Briefing on Beacon Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
409 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Beacon Storage is a 409 MW Battery project in Texas, currently active.

AES Distributed Energy, Inc is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-10-01.

Queue ID
ERCOT-23INR0127
Location
Harris, Texas
Technology
Battery
Developer
AES Distributed Energy, Inc
Market / region
ERCOT
Point of interconnection
40450 Deepwater 345kV

What stands out

1

Beacon Storage is a 409 MW Battery project in Texas with status active.

2

AES Distributed Energy, Inc is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-10-01.

4

Latest linked story: “UT Dallas Teams with Argonne National Lab on Battery Research” (The University of Texas at Dallas, 2025-09-17).

Market and operating context

Queue date
2021-05-05
Proposed COD
2029-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Beacon Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0127
LocationHarris, Texas
TechnologyBattery
DeveloperAES Distributed Energy, Inc
Market / regionERCOT
Point of interconnection40450 Deepwater 345kV
Queue date2021-05-05
Proposed COD2029-10-01