Briefing on Bayonne Energy Center III

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Battery
Technology
NYISO
Market / region
2028-03-01
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

Bayonne Energy Center III is a 50 MW Battery project in New York, currently active.

Bayonne Energy Center III, LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2028-03-01.

Queue ID
NYISO-815
Location
Kings, New York
Technology
Battery
Developer
Bayonne Energy Center III, LLC
Market / region
NYISO
Point of interconnection
Gowanus 345kV

What stands out

1

Bayonne Energy Center III is a 50 MW Battery project in New York with status active.

2

Bayonne Energy Center III, LLC is the reported developer.

3

The reported queue phase is System Impact Study; proposed COD is 2028-03-01.

Market and operating context

Queue date
2019-04-05
Proposed COD
2028-03-01
IA status
System Impact Study
Study phase
System Impact Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bayonne Energy Center III — verified asset snapshot

FieldValue
Queue IDNYISO-815
LocationKings, New York
TechnologyBattery
DeveloperBayonne Energy Center III, LLC
Market / regionNYISO
Point of interconnectionGowanus 345kV