Briefing/projectactive
Bayonne Energy Center III is a 50 MW Battery project in New York, currently active.
Bayonne Energy Center III, LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2028-03-01.
- Queue ID
- NYISO-815
- Location
- Kings, New York
- Technology
- Battery
- Developer
- Bayonne Energy Center III, LLC
- Market / region
- NYISO
- Point of interconnection
- Gowanus 345kV
What stands out
1
Bayonne Energy Center III is a 50 MW Battery project in New York with status active.
2
Bayonne Energy Center III, LLC is the reported developer.
3
The reported queue phase is System Impact Study; proposed COD is 2028-03-01.
Market and operating context
- Queue date
- 2019-04-05
- Proposed COD
- 2028-03-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.