Bayonne Energy Center III
49.8 MW storage in Kings, NY · In queue since April 2019 · Proposed COD March 2028
49.8 MW
Capacity
1
Components
Battery
7y 3m
In Queue
System Impact Study
IA Phase
Signed Apr 2023
Queue → IA
4 years
IA → COD
4y 11m
Total Duration
4 years
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2028-03-01
The Bayonne Energy Center III project is a proposed 49.8 MW battery storage project located in Kings County, New York. The project, developed by Bayonne Energy Center, is currently in the NYISO interconnection queue as entry NYISO-815, with a queue entry date of April 5, 2019. The proposed commercial operation date is September 1, 2026.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Gowanus 345kV substation. The project is linked to an existing operating plant and has appeared in recent news coverage.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Kings
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Bayonne Energy Center III, LLC
Utility
ConEd
Entity
NYISO
Service Type
—
Point of Interconnection
Gowanus 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE J
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GOWANUS_GT2_1
- POI Substation
- Gowanus Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Bayonne Energy Center IIIForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.