Briefing/projectactive
Aurelius 2 Solar is a 445 MW Solar project in Texas, currently active.
IP Roman, is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.
- Queue ID
- ERCOT-29INR0009
- Location
- Deaf Smith, Texas
- Technology
- Solar
- Developer
- IP Roman,
- Market / region
- ERCOT
- Point of interconnection
- 23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).
What stands out
1
Aurelius 2 Solar is a 445 MW Solar project in Texas with status active.
2
IP Roman, is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-30.
Market and operating context
- Queue date
- 2023-12-04
- Proposed COD
- 2028-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.