Query
Aurelius 2 Solar
Type
Entity Briefing
Entity
Aurelius 2 Solar
Technology
solar
Generated
2026-10-20T04:28:04.844Z

Briefing on Aurelius 2 Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
445 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Aurelius 2 Solar is a 445 MW Solar project in Texas, currently active.

IP Roman, is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-29INR0009
Location
Deaf Smith, Texas
Technology
Solar
Developer
IP Roman,
Market / region
ERCOT
Point of interconnection
23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).

What stands out

1

Aurelius 2 Solar is a 445 MW Solar project in Texas with status active.

2

IP Roman, is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

Market and operating context

Queue date
2023-12-04
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Aurelius 2 Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0009
LocationDeaf Smith, Texas
TechnologySolar
DeveloperIP Roman,
Market / regionERCOT
Point of interconnection23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).
Queue date2023-12-04
Proposed COD2028-09-30