Briefing/projectactive
ATHOS POWER PLANT is a 908 MW Solar+Battery project in California, currently active.
The reported queue phase is C10. Proposed COD is 2027-05-17.
- Queue ID
- CAISO-1405
- Location
- Riverside, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Red Bluff Substation 230kV
What stands out
1
ATHOS POWER PLANT is a 908 MW Solar+Battery project in California with status active.
2
The reported queue phase is C10; proposed COD is 2027-05-17.
3
Latest linked story: “Tesla lands 15.3 GWh Megapack supply contract” (pv magazine USA, 2024-07-19).
Market and operating context
- Queue date
- 2017-05-01
- Proposed COD
- 2027-05-17
- IA status
- IA Executed
- Study phase
- C10
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.