ATHOS POWER PLANT (CAISO-1405) — Project Summary

Queue ID
CAISO-1405
Capacity
908 MW
Technology
Solar+Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
—
IA Status
IA Executed

ATHOS POWER PLANT

CAISO-1405BetaActiveSolarBatteryCAISOLBNL + Live

908 MW hybrid in Riverside, CA · In queue since May 2017 · Proposed COD May 2027

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

908 MW

Capacity

2

Components

Solar + Battery

9y 6m

In Queue

IA Executed

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

8y 5m

IA → COD

1y 7m

Total Duration

8y 5m

Study Phase

C10

Construction75%
Queue EntryMay 1, 2017

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementOct 27, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C10

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-05-17

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 17, 2027
From queue filing
Developer in saved assessment
Intersect Power
Status at research time
IA Executed
Active in the CAISO queue with an interconnection agreement executed 2025-10-27, targeting 2027 online. Earlier Athos phases (e.g., Athos III) are reported operational, but this 908 MW queue entry is not.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. pv-magazine-usa.com/2024/07/19/tesla-lands-15-3-gwh-megapack-supply-contract/
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/1405_storage/athos-power-plant
  3. cleanview.co/power-projects/developers/sb-energy
  4. nsenergybusiness.com/projects/athos-iii-solar-storage-project/
  5. energy-storage.news/intersect-power-brings-solar-plus-storage-with-448mwh-bess-online-in-california/

Commercial operation date: The LBNL proposed COD is 2027-05-17. Cleanview says 'Expected online 2027', which is consistent but probably derived from the queue data, so it is not an independent confirmation. No developer press release or news article gives a different date.

Developer: The LBNL developer field is null, so there is nothing to compare against. News extraction (pv magazine USA, 2024-07) names Intersect Power, and Intersect has brought online an Athos-branded phase (Athos III). A Cleanview SB Energy pipeline page also lists 'Athos Power Plant', which suggests a possible ownership or partner change that I could not verify from these sources.

Status: LBNL shows status active, IA status 'IA Executed' (2025-10-27) and is_operational false. No source indicates withdrawal, suspension or construction start for this entry.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Athos Power Plant is a proposed 908 MW hybrid solar and battery project located in Riverside County, California. The development project, consisting of 458 MW of solar and 450 MW of battery storage, is interconnected to Southern California Edison (SCE) within the CAISO region.

The project, identified as CAISO-1405 in the CAISO interconnection queue, entered the queue on May 1, 2017, and has a proposed commercial operation date of May 17, 2027. An Interconnection Agreement (IA) was executed on December 21, 2018. The point of interconnection (POI) is the Red Bluff Substation at 230kV. The Athos Power Plant has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Red Bluff Substation 230kV

Data Source

LBNL + Live

DeveloperIntersect Powerpv magazine USA · 2024-07-19
TransactionPPApv magazine USA · 2024-07-19
OfftakerIntersect Powerpv magazine USA · 2024-07-19
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar458 MW · 50%
Battery450 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.