ARIDA 2 SOLAR FARM is a 1.4 GW Solar+Battery project in Nevada, currently active.
The reported queue phase is C12. Proposed COD is 2029-05-31.
- Queue ID
- CAISO-1647
- Location
- Clark, Nevada
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Mohave Substation 500kV
What stands out
1
ARIDA 2 SOLAR FARM is a 1.4 GW Solar+Battery project in Nevada with status active.
2
The reported queue phase is C12; proposed COD is 2029-05-31.
Market and operating context
- Queue date
- 2019-04-15
- Proposed COD
- 2029-05-31
- IA status
- In Progress (unknown study)
- Study phase
- C12
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.