ARIDA 2 SOLAR FARM (CAISO-1647) — Project Summary

Queue ID
CAISO-1647
Capacity
1400 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
—
IA Status
In Progress (unknown study)

ARIDA 2 SOLAR FARM

CAISO-1647BetaActiveSolarBatteryCAISOLBNL + Live

1,400 MW hybrid in Clark, NV · In queue since April 2019 · Proposed COD May 2029

BA: NEVPISO/RTO: CAISONERC: WECCRC: SPPW

1,400 MW

Capacity

2

Components

Solar + Battery

7y 7m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 1m

Study Phase

C12

In Study38%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; IA In Progress; C12

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 31, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue (study phase, Mohave 500kV POI). The IA is still in progress. Clark County approved a $1B 'Arida Solar Center' in Laughlin in Aug 2025, which may be this project, but the link is unconfirmed.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interxdata.com/projects/arida-2-solar-farm-caiso-public-queue-1647/
  2. app.nrgmap.com/queues/caiso-1647
  3. amcompute.com/data-center-site-finder/nevada
  4. nevbex.com/2025/08/23/arida-solar-center-laughlin/

Commercial operation date: Only the queue-derived date exists: LBNL proposed_cod is 2029-05-31, and aggregator pages such as amcompute list 'in service 2029-05'. These pages repeat the queue data, so they are not independent. No developer press release or news item gives a different target.

Developer: The LBNL developer field is null and no search result names a developer for Arida 2. The pv magazine result about Avantus concerns Aratina 1 in California, a different project, so I did not link it. The Nevbex article on the 'Arida Solar Center' in Laughlin names no developer in its snippet.

Status: LBNL, the CAISO public queue report, and NRG Map (active as of 2026-09-29) and interXdata (checked 2026-10-24) all show Active. No source shows withdrawal, construction start, or an executed IA.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The ARIDA 2 SOLAR FARM is a proposed 1400 MW hybrid solar and battery project located in Clark County, Nevada. The project, which consists of 700 MW of solar generation and 700 MW of battery storage, is interconnected to Southern California Edison (SCE) within the California Independent System Operator (CAISO) region.

The project is listed in the CAISO interconnection queue as entry CAISO-1647, with an interconnection queue entry date of April 15, 2019. The proposed commercial operation date is May 31, 2029. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Mohave Substation 500kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Mohave Substation 500kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar700 MW · 50%
Battery700 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SOPOINT_LNODE-2
POI Substation
Mohave Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.