204 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2029-05-21
Proposed COD
C14
Queue phase
Briefing/projectactive

APACHE STORAGE is a 204 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2029-05-21.

Queue ID
CAISO-1930
Location
Fresno, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Sanger 115 kV

What stands out

1

APACHE STORAGE is a 204 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2029-05-21.

3

Latest linked story: “NRS's Shallow Basket Energy Project Brings Renewable Energy to Jicarilla Apache Nation, Building on Legacy of Environmental Stewardship” (PR Newswire, 2025-08-15).

Market and operating context

Queue date
2021-04-15
Proposed COD
2029-05-21
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

APACHE STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-1930
LocationFresno, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionSanger 115 kV
Queue date2021-04-15
Proposed COD2029-05-21
IA statusIA Executed