Query
Antonio Road BESS
Type
Entity Briefing
Entity
Antonio Road BESS
State
CO
Technology
battery
Generated
2026-10-19T09:13:01.942Z

Briefing on Antonio Road BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
156 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Antonio Road BESS is a 156 MW Battery project in Texas, currently active.

Tempus Power management LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-01.

Queue ID
ERCOT-27INR0090
Location
Bastrop, Texas
Technology
Battery
Developer
Tempus Power management LLC
Market / region
ERCOT
Point of interconnection
Paige 138kV, bus 7308, connecting to the existing substation via adding a breaker

What stands out

1

Antonio Road BESS is a 156 MW Battery project in Texas with status active.

2

Tempus Power management LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-01.

Market and operating context

Queue date
2023-10-13
Proposed COD
2027-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Antonio Road BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0090
LocationBastrop, Texas
TechnologyBattery
DeveloperTempus Power management LLC
Market / regionERCOT
Point of interconnectionPaige 138kV, bus 7308, connecting to the existing substation via adding a breaker
Queue date2023-10-13
Proposed COD2027-06-01