Briefing on Amerada Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Amerada Solar is a 302 MW Solar+Battery project in Texas, currently active.

Amerada Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-30.

Queue ID
ERCOT-26INR0082
Location
Freestone, Texas
Technology
Solar+Battery
Developer
Amerada Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5

What stands out

1

Amerada Solar is a 302 MW Solar+Battery project in Texas with status active.

2

Amerada Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-30.

Market and operating context

Queue date
2023-05-15
Proposed COD
2028-12-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Amerada Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0082
LocationFreestone, Texas
TechnologySolar+Battery
DeveloperAmerada Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5
Queue date2023-05-15
Proposed COD2028-12-30