Briefing/projectactive
ALTA VISTA SUNTOWER GENERATING STATION is a 132 MW Solar+Battery project in California, currently active.
The reported queue phase is TC. Proposed COD is 2027-12-11.
- Queue ID
- CAISO-297
- Location
- Los Angeles, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Neenach-Bailey 66kV line
What stands out
1
ALTA VISTA SUNTOWER GENERATING STATION is a 132 MW Solar+Battery project in California with status active.
2
The reported queue phase is TC; proposed COD is 2027-12-11.
Market and operating context
- Queue date
- 2008-01-18
- Proposed COD
- 2027-12-11
- IA status
- IA Executed
- Study phase
- TC
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.