Query
Albatross BESS 2
Type
Entity Briefing
Entity
Albatross BESS 2
State
TN
Technology
battery
Generated
2026-10-18T17:01:37.770Z

Briefing on Albatross BESS 2

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
160 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-02-22
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Albatross BESS 2 is a 160 MW Battery project in Texas, currently active.

Albatross Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-22.

Queue ID
ERCOT-25INR0579
Location
Mclennan, Texas
Technology
Battery
Developer
Albatross Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 165 Windsor Switch - 161 McGregor

What stands out

1

Albatross BESS 2 is a 160 MW Battery project in Texas with status active.

2

Albatross Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-02-22.

Market and operating context

Queue date
2024-02-27
Proposed COD
2028-02-22
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Albatross BESS 2 — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0579
LocationMclennan, Texas
TechnologyBattery
DeveloperAlbatross Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 165 Windsor Switch - 161 McGregor
Queue date2024-02-27
Proposed COD2028-02-22