Agave is a 300 MW Batteries asset in Arizona, currently Operating.
Agave is reported in Arizona since 2023 under Pinnacle West Capital. Available operating and financial measures include 11.3% capacity factor and 298 GWh annual generation; $1582/kW reported CapEx.
- Location
- Maricopa, Arizona
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Pinnacle West Capital
- Operator
- Arizona Public Service Co
- Grid
- Arizona Public Service Company
- Plant ID
- 67964
What stands out
Agave is a 300 MW Batteries asset in Arizona with status Operating.
Latest annual operating measures report 11.3% capacity factor and 298 GWh annual generation.
Available financial measures include $0.0/MWh OpEx, $1582/kW CapEx.
Latest linked story: “APS Fires Up Agave Mega-Batteries To Keep Phoenix Running After Dark” (Hoodline, 2026-04-05).
Market and operating context
- Balancing authority
- Arizona Public Service Company
- NERC region
- WECC
- State rank
- #24 of 61
- National rank
- #97 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.