Briefing on Aegle Power

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
1.5 GW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2027-07-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Aegle Power is a 1.5 GW Gas project in Texas, currently active.

Aegle Power LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-30.

Queue ID
ERCOT-27INR0084
Location
Cameron, Texas
Technology
Gas
Developer
Aegle Power LLC
Market / region
ERCOT
Point of interconnection
(#79501) Kingfisher 345 kV

What stands out

1

Aegle Power is a 1.5 GW Gas project in Texas with status active.

2

Aegle Power LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-07-30.

Market and operating context

Queue date
2024-07-22
Proposed COD
2027-07-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Aegle Power — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0084
LocationCameron, Texas
TechnologyGas
DeveloperAegle Power LLC
Market / regionERCOT
Point of interconnection(#79501) Kingfisher 345 kV
Queue date2024-07-22
Proposed COD2027-07-30