Aegle Power
1,536.4 MW generation in Cameron, TX · In queue since July 2024 · Proposed COD July 2027
1,536.4 MW
Capacity
1
Components
Gas
2y 4m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-30
Projected COD moved
0 times
Jul 2027 → Jul 2027
Net change
0 months
first report to latest
Capacity
1536 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- powermag.com/major-project-rejected-in-texas-flagship-dispatchable-power-loan-program/
- reuters.com/business/energy/texas-gas-plant-proposal-rejected-state-financing-program-2024-09-05/
- utilitydive.com/news/texas-puc-aegle-power-loan-gas-plant-nextera/726134/
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/27INR0084/aegle-power
- interchange.puc.texas.gov/search/filings/?ControlNumber=56455
Commercial operation date: Only the LBNL filing (proposed COD 2027-07-30) gives a date. Cleanview's 'expected to come online in July 2027' appears to repeat the queue data rather than add an independent signal. The project lost its Texas Energy Fund loan bid in 2024, so the date is unconfirmed and may be optimistic.
Developer: News coverage and the PUC filings name Aegle Power, LLC as the applicant, matching the LBNL filing entity. NextEra Energy Resources was listed as a sponsor without authorization, so it is not a real parent or owner. No parent company or ownership change is documented.
Status: LBNL lists the project as active, and nothing in the search results shows a withdrawal or cancellation. The PUCT loan denial hurt its financing prospects but did not remove it from the queue.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Aegle Power LLC is proposing a 1536.4 MW gas-fired generation project called Aegle Power in Cameron County, Texas. The project is located within the ERCOT region and is interconnected at the (#79501) Kingfisher 345 kV point of interconnection. The project entered the ERCOT interconnection queue as ERCOT-27INR0084 on July 22, 2024, with a proposed commercial operation date of July 30, 2027. The project's interconnection status is currently in the Facility Study phase.
The Aegle Power project has been the subject of recent news coverage, with five articles focusing on regulatory matters and deals.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Aegle Power LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
(#79501) Kingfisher 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.