Briefing/projectactive
2 Cedar Wind is a 180 MW Wind project in Texas, currently active.
SunWR, LLC is the reported developer. Proposed COD is 2028-05-02.
- Queue ID
- ERCOT-28INR0286
- Location
- Fannin, Texas
- Technology
- Wind
- Developer
- SunWR, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 1729 Valley South – Anna Switch 2373
What stands out
1
2 Cedar Wind is a 180 MW Wind project in Texas with status active.
2
SunWR, LLC is the reported developer.
3
proposed COD is 2028-05-02.
Market and operating context
- Queue date
- 2025-07-07
- Proposed COD
- 2028-05-02
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.