Query
2 Cedar Wind
Type
Entity Briefing
Entity
2 Cedar Wind
Technology
wind
Generated
2026-10-19T09:35:26.167Z

Briefing on 2 Cedar Wind

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
180 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-05-02
Proposed COD
Briefing/projectactive

2 Cedar Wind is a 180 MW Wind project in Texas, currently active.

SunWR, LLC is the reported developer. Proposed COD is 2028-05-02.

Queue ID
ERCOT-28INR0286
Location
Fannin, Texas
Technology
Wind
Developer
SunWR, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 1729 Valley South – Anna Switch 2373

What stands out

1

2 Cedar Wind is a 180 MW Wind project in Texas with status active.

2

SunWR, LLC is the reported developer.

3

proposed COD is 2028-05-02.

Market and operating context

Queue date
2025-07-07
Proposed COD
2028-05-02

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

2 Cedar Wind — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0286
LocationFannin, Texas
TechnologyWind
DeveloperSunWR, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 1729 Valley South – Anna Switch 2373
Queue date2025-07-07
Proposed COD2028-05-02