WAPA-RM-2025-G6
100 MW hybrid in — · In queue since October 2025 · Proposed COD December 2028
100 MW
Capacity
1
Components
Solar
1y 1m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
WAPA-RM-2025-G6 is a proposed hybrid solar and battery storage development project in the western United States, with a total capacity of 100 megawatts (MW). The project pairs a 100 MW solar photovoltaic component with a battery energy storage component, for which no individual capacity is specified in the queue data. The developer has not been publicly identified. The project would connect to the transmission system at the Lost Canyon–Shiprock 230-kV line, within the service territory of the Western Area Power Administration (WAPA) Rocky Mountain Region.
The project entered the WAPA Rocky Mountain Region (WAPA-RM) interconnection queue on October 9, 2025, and holds active status. Its interconnection agreement status is listed as in progress, though the specific study phase is not identified. The proposed commercial operation date is December 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
Mountain West
Market
—
Developer
—
Utility
WAPA Rocky Mountain Region
Entity
WAPA-RM
Service Type
—
Point of Interconnection
Lost Canyon - Shiprock 230-kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project WAPA-RM-2025-G6Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.