WAPA-RM-2025-G5
100 MW generation in — · In queue since September 2025 · Proposed COD July 2028
100 MW
Capacity
1
Components
Solar
1y 2m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-30
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
WAPA-RM-2025-G5 is a proposed 100 MW solar generation project located in the western United States. No project name, developer, or county and state location is specified in the available interconnection data, so the project is identified by its queue ID. The development project consists of a single solar component with a capacity of 100 MW. It is proposed to interconnect at the Bucknum Tap Substation at 115 kV, within the service territory of the Western Area Power Administration (WAPA) Rocky Mountain Region.
The project entered the WAPA Rocky Mountain Region (WAPA-RM) interconnection queue on September 30, 2025, and its queue status is listed as active. Its interconnection agreement status is reported as in progress, although the specific study phase is not identified. The proposed commercial operation date is July 30, 2028. The available data does not link the project to an existing operating plant in U.S. Energy Information Administration (EIA) records, and no recent news coverage of the project is noted.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
Mountain West
Market
—
Developer
—
Utility
WAPA Rocky Mountain Region
Entity
WAPA-RM
Service Type
—
Point of Interconnection
Bucknum Tap Substation 115kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project WAPA-RM-2025-G5Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.