TSGT-GI-TC-2024-31
398 MW hybrid in Elbert, CO · In queue since May 2024 · Proposed COD December 2028
398 MW
Capacity
1
Components
Solar
2y 6m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 7m
Study Phase
TC-2024
Interconnection request submitted to ISO/RTO
IA FULLY EXECUTED/ON SCHEDULE
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
About
Generated Apr 10, 2026 · Predates Oct 22, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
TSGT-GI-TC-2024-31 is a proposed 398 MW hybrid solar and battery project located in Elbert County, Colorado. The development project, under the utility Tri-State Generation and Transmission Association (TSGT), consists of 398 MW of solar capacity. It is currently active in the Tri-State Generation and Transmission Association interconnection queue, with an entry date of May 29, 2024, and a proposed commercial operation date of December 31, 2028.
The interconnection agreement for the project is currently in progress, with the specific study status unknown. The point of interconnection is the Lincoln - Midway 230 kV Line. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CO
County
Elbert
Grid Region
Mountain West
Market
—
Developer
—
Utility
Tri-State Generation and Transmission Association
Entity
TSGT
Service Type
ERIS
Point of Interconnection
Lincoln - Midway 230 kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.