Project TSGT-GI-CS-2025-21 — Project Summary

Queue ID
TSGT-GI-CS-2025-21
Capacity
325 MW
Technology
Solar+Battery
Status
active
Location
Pueblo, CO
Region
West
Developer
—
IA Status
Cluster Study

TSGT-GI-CS-2025-21

TSGT-GI-CS-2025-21BetaActiveSolarBatteryTSGTLBNL

325 MW hybrid in Pueblo, CO · In queue since September 2025 · Proposed COD February 2030

BA: PSCONERC: WECCRC: SPPW

325 MW

Capacity

1

Components

Solar

1y 2m

In Queue

Cluster Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Study Phase

GI 2025 Cluster Study

Impact Study25%
Queue EntrySep 29, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-02-15

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

TSGT-GI-CS-2025-21 is a proposed solar and battery storage hybrid development project in Pueblo County, Colorado, in the western United States. The project has a total capacity of 325 megawatts (MW). The listed component is 325 MW of solar generation, and the project also includes a battery storage element whose individual capacity is not specified. No developer has been publicly identified in the queue data. The project would interconnect to the system of the Tri-State Generation and Transmission Association (TSGT). Its proposed point of interconnection is the Walsenburg–Comanche 230 kV transmission line.

The project entered Tri-State's generator interconnection queue on September 29, 2025, and its queue status is active. It is being evaluated in the GI 2025 Cluster Study, and its interconnection agreement status is listed as "Cluster Study." The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its proposed commercial operation date is February 15, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CO

County

Pueblo

Grid Region

Mountain West

Market

—

Developer

—

Utility

Tri-State Generation and Transmission Association

Entity

TSGT

Service Type

NRIS/ERIS

Point of Interconnection

Walsenburg - Comanche 230kV Line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.