Project TEC-121 — Project Summary

Queue ID
TEC-121
Capacity
74.5 MW
Technology
Solar
Status
active
Location
Hillsborough, FL
Region
Southeast
Developer
—
IA Status
Cluster Study

TEC-121

TEC-121BetaActiveSolarTECLBNL

74.5 MW generation in Hillsborough, FL · In queue since May 2025 · Proposed COD December 2027

BA: FPLNERC: FRCCRC: FRCC

74.5 MW

Capacity

1

Components

Solar

1y 6m

In Queue

Cluster Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 7m

Study Phase

2025 Cluster Study Underway

Impact Study25%
Queue EntryMay 6, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

TEC-121 is a proposed 74.5 MW solar generation project located in Hillsborough County, Florida, in the southeastern United States. The development project is listed in the interconnection queue of Tampa Electric Company (TEC), which serves as the interconnecting utility. No developer has been publicly identified in the queue data. The project would connect to the grid at the Mines Substation in Hillsborough County and has requested Network Resource Interconnection Service (NRIS).

The project entered TEC's interconnection queue on May 6, 2025, and is currently listed with an active status. Its interconnection agreement status is designated as "Cluster Study," and the project is being evaluated as part of the 2025 Cluster Study, which is underway. The proposed commercial operation date for the project is December 1, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

FL

County

Hillsborough

Grid Region

Southeast

Market

—

Developer

—

Utility

Tampa Electric Company

Entity

TEC

Service Type

NRIS

Point of Interconnection

Mines Substation, Hillsborough County, Florida

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.