Project TEC-118 — Project Summary

Queue ID
TEC-118
Capacity
132 MW
Technology
Gas
Status
active
Location
Polk, FL
Region
Southeast
Developer
—
IA Status
Cluster Study

TEC-118

TEC-118BetaActiveGasCoalTECLBNL

132 MW hybrid in Polk, FL · In queue since April 2025 · Proposed COD June 2026

BA: FPLNERC: FRCCRC: FRCC

132 MW

Capacity

1

Components

Gas

1y 7m

In Queue

Cluster Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 2m

Schedule

6 months past proposed COD

Study Phase

2025 Cluster Study Underway

Impact Study25%
Queue EntryApr 10, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

TEC-118 is a proposed natural gas development project in Polk County, Florida, in the southeastern United States. The project has a total capacity of 132 MW and is classified as a hybrid project. Its technology details list both gas and coal, though its single defined component is 132 MW of gas generation. The utility associated with the project is Tampa Electric Company (TEC), and the proposed point of interconnection is the Polk Substation in Polk County, Florida.

The project entered the Tampa Electric Company interconnection queue on April 10, 2025, and its status is active. It has requested Energy Resource Interconnection Service (ERIS). The interconnection agreement status is listed as "Cluster Study," and the project is part of the 2025 Cluster Study, which is currently underway. The proposed commercial operation date is June 1, 2026.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

FL

County

Polk

Grid Region

Southeast

Market

—

Developer

—

Utility

Tampa Electric Company

Entity

TEC

Service Type

ERIS

Point of Interconnection

Polk Substation, Polk County, Florida

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.