Project SRP-Q66 — Project Summary

Queue ID
SRP-Q66
Capacity
30 MW
Technology
Gas
Status
active
Location
Maricopa, AZ
Region
West
Developer
—
IA Status
—

SRP-Q66

SRP-Q66BetaActiveGasSRPLBNL

30 MW generation in Maricopa, AZ · In queue since November 2020 · Proposed COD October 2022

BA: AZPSNERC: WECCRC: SPPW

30 MW

Capacity

1

Components

Gas

6 years

In Queue

—

IA Status

COD target: 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 11m

Schedule

51 months past proposed COD

Study Phase

SRP

Pre-Study0%
Queue EntryNov 11, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-10-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SRP-Q66 is a proposed 30 MW natural gas generation project located in Maricopa County, Arizona, in the western United States. The development project consists of a single gas-fired component with a capacity of 30 MW. No developer or project name has been identified in the available queue data. The proposed point of interconnection is the Santan 69 kV substation, within the service territory of the Salt River Project (SRP).

The project entered the Salt River Project interconnection queue on November 11, 2020, and holds an active status. Its study phase is listed as "SRP." The project's proposed commercial operation date was October 1, 2022. That date has passed, and the project remains listed as active in the queue. No interconnection agreement status is reported in the available data.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

Mountain West

Market

—

Developer

—

Utility

Salt River Project

Entity

SRP

Service Type

—

Point of Interconnection

Santan 69 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.