Project SRP_PV-PC-Q09 — Project Summary

Queue ID
SRP_PV-PC-Q09
Capacity
400 MW
Technology
Solar+Battery
Status
active
Location
Pinal, AZ
Region
West
Developer
—
IA Status
—

SRP_PV-PC-Q09

SRP_PV-PC-Q09BetaActiveSolarBatterySRP_PV-PCLBNL

400 MW hybrid in Pinal, AZ · In queue since September 2018 · Proposed COD May 2028

BA: AZPSNERC: WECCRC: SPPW

400 MW

Capacity

2

Components

Solar + Battery

8y 2m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9y 8m

Study Phase

PV-PC

Pre-Study0%
Queue EntrySep 12, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Queue ID SRP_PV-PC-Q09 is a proposed hybrid solar and battery storage development project located in Pinal County, Arizona, within the western United States. The project has a total capacity of 400 MW, consisting of a 200 MW solar photovoltaic component paired with a 200 MW battery energy storage component. No developer has been publicly identified in the available interconnection data. The project is proposed to connect to the grid at the Pinal Central 230 kV point of interconnection.

The project is listed in the interconnection queue of Salt River Project (SRP), where it entered the queue on September 12, 2018, and currently holds an active status. It is associated with the PV-PC study phase. The proposed commercial operation date is May 1, 2028. The available data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Pinal

Grid Region

Mountain West

Market

—

Developer

—

Utility

Salt River Project

Entity

SRP_PV-PC

Service Type

—

Point of Interconnection

Pinal Central 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar200 MW · 50%
Battery200 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SRP_PV-PC-Q09
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.