Project SRP_ANPP-Q40 — Project Summary

Queue ID
SRP_ANPP-Q40
Capacity
425 MW
Technology
Gas
Status
active
Location
Maricopa, AZ
Region
West
Developer
—
IA Status
—

SRP_ANPP-Q40

SRP_ANPP-Q40BetaActiveGasSRP_ANPPLBNL

425 MW generation in Maricopa, AZ · In queue since August 2023 · Proposed COD June 2028

BA: AZPSNERC: WECCRC: SPPW

425 MW

Capacity

1

Components

Gas

3y 3m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 10m

Study Phase

ANPP HVS

Pre-Study0%
Queue EntryAug 18, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SRP_ANPP-Q40 is a proposed 425 MW natural gas-fired generation project in Maricopa County, Arizona, in the western United States. The development project consists of a single gas generation component rated at 425 MW. It is located within the service territory of Salt River Project, the utility administering its interconnection request, and no developer is identified in the available queue data.

The project entered the interconnection queue on August 18, 2023, under the SRP_ANPP entity, and its queue status is listed as active. It proposes to interconnect at the Hassayampa 500 kV point of interconnection and is in the study phase designated "ANPP HVS." The proposed commercial operation date is June 1, 2028. The available data does not indicate whether an interconnection agreement has been executed.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

Mountain West

Market

—

Developer

—

Utility

Salt River Project

Entity

SRP_ANPP

Service Type

—

Point of Interconnection

Hassayampa 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SRP_ANPP-Q40
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.