Project SRP_ANPP-Q29 — Project Summary

Queue ID
SRP_ANPP-Q29
Capacity
500 MW
Technology
Solar+Battery
Status
active
Location
Maricopa, AZ
Region
West
Developer
—
IA Status
—

SRP_ANPP-Q29

SRP_ANPP-Q29BetaActiveSolarBatterySRP_ANPPLBNL

500 MW hybrid in Maricopa, AZ · In queue since June 2021 · Proposed COD December 2027

BA: AZPSNERC: WECCRC: SPPW

500 MW

Capacity

2

Components

Solar + Battery

5y 5m

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 6m

Study Phase

ANPP HVS

Pre-Study0%
Queue EntryJun 24, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SRP_ANPP-Q29 is a proposed hybrid solar and battery storage development project located in Maricopa County, Arizona, in the western United States. The project has a total capacity of 500 MW, consisting of a 250 MW solar photovoltaic component paired with a 250 MW battery energy storage component. The proposed project would connect to the grid at the Hassayampa 500 kV point of interconnection, with Salt River Project serving as the associated utility. No developer has been publicly identified in the queue data.

The project entered the interconnection queue administered under the SRP_ANPP entity on June 24, 2021, and currently holds an active status. It is being evaluated in the ANPP HVS study phase, which refers to the Arizona Nuclear Power Project High Voltage Switchyard. The project's proposed commercial operation date is December 31, 2027. Information on the status of an interconnection agreement was not provided in the available data.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

Mountain West

Market

—

Developer

—

Utility

Salt River Project

Entity

SRP_ANPP

Service Type

—

Point of Interconnection

Hassayampa 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar250 MW · 50%
Battery250 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.