TSGT-GI-RSC-2025-02
200 MW storage in Moffat, CO · In queue since July 2025 · Proposed COD September 2029
200 MW
Capacity
1
Components
Battery
1y 4m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Study Phase
RSC-2025
Interconnection request submitted to ISO/RTO
IA FULLY EXECUTED/ON SCHEDULE
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Queue ID TSGT-GI-RSC-2025-02 is a proposed battery energy storage project located in Moffat County, Colorado, in the western United States. The development project has a total capacity of 200 MW, consisting of a single battery storage component. It is listed in the interconnection queue of Tri-State Generation and Transmission Association (TSGT), which serves as the transmission provider for the request. No developer has been publicly identified in the available queue data.
The project entered the Tri-State queue on July 18, 2025, and currently holds an active status. It is being evaluated as part of the RSC-2025 study phase, and its interconnection agreement status is listed as in progress, with the specific study stage unspecified. The proposed point of interconnection is the Craig 230 kV Substation, and the request seeks Energy Resource Interconnection Service (ERIS). The project's proposed commercial operation date is September 1, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CO
County
Moffat
Grid Region
Mountain West
Market
—
Developer
—
Utility
Tri-State Generation and Transmission Association
Entity
TSGT
Service Type
ERIS
Point of Interconnection
Craig 230kV Sub
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.