TSGT-GI-CS-2025-04
330 MW hybrid in Laramie, WY · In queue since September 2025 · Proposed COD November 2029
330 MW
Capacity
1
Components
Wind
1y 2m
In Queue
Cluster Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Study Phase
GI 2025 Cluster Study
Interconnection request submitted to ISO/RTO
FACILITY STUDY STAGE
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-30
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
TSGT-GI-CS-2025-04 is a proposed hybrid wind and battery storage development project in Laramie County, Wyoming, in the western United States. The project has a total capacity of 330 MW, all of which is attributed to its wind component. A battery storage element is also included, but no separate capacity has been specified for it. No project name or developer has been publicly identified, so the project is referenced by its queue identifier.
The project is in the interconnection queue administered by Tri-State Generation and Transmission Association (TSGT). It entered the queue on September 17, 2025, and its status is active. It is being evaluated in TSGT's GI 2025 Cluster Study, and its interconnection agreement status is listed as Cluster Study. The proposed point of interconnection is the Ault–LRS 345 kV transmission line. The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its proposed commercial operation date is November 30, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- SPP queue source as of: Oct 22, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WY
County
Laramie
Grid Region
Mountain West
Market
—
Developer
—
Utility
Tri-State Generation and Transmission Association
Entity
TSGT
Service Type
NRIS/ERIS
Point of Interconnection
Ault LRS 345kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Max 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
GL Wind
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.