Project SPP-GEN-2026-SR36 — Project Summary

Queue ID
SPP-GEN-2026-SR36
Capacity
72.5 MW
Technology
Battery
Status
active
Location
Caddo Parish, LA
Region
SPP
Developer
—
IA Status
—

SPP-GEN-2026-SR36

SPP-GEN-2026-SR36BetaActiveBattery/StorageSPPLive · SPP

72.5 MW storage in Caddo Parish, LA · In queue since July 2026 · Proposed COD July 2026

BA: MISOISO/RTO: SPPNERC: SERCRC: MISO

72.5 MW

Capacity

0

Components

3 months

In Queue

—

IA Status

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

<1 month

Schedule

3 months past proposed COD

Pre-Study0%
Queue EntryJul 28, 2026

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-07-29

About

SPP-GEN-2026-SR36 is a proposed battery energy storage development project located in Caddo Parish, Louisiana. The project has a total capacity of 72.5 MW and is classified as a standalone storage facility. It is associated with DESRI, which is listed as the utility for the project in the interconnection queue data. The project is planned to connect to the grid at the Hosston 69kV point of interconnection.

The project is in the interconnection queue of the Southwest Power Pool (SPP), the regional transmission organization serving the area, where it currently holds active status. It entered the queue on July 28, 2026, and has a proposed commercial operation date of July 29, 2026, one day after its queue entry. The project has requested Network Resource (NR) interconnection service. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Caddo Parish

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

DESRI

Entity

SPP

Service Type

NR

Point of Interconnection

Hosston 69kV

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
POI Substation
Hosston Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2026-SR36
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.