SPP-GEN-2026-SR33
202 MW storage in Oliver County, ND · In queue since July 2026 · Proposed COD December 2029
202 MW
Capacity
0
Components
3 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 5m
Interconnection request submitted to ISO/RTO
SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.
Typical: 36–48 months (improving)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-03
SPP-GEN-2026-SR33 is a proposed battery energy storage project located in Oliver County, North Dakota. The development project has a total capacity of 202 MW and is listed under the Battery/Storage technology category. No developer name or project name is available in the interconnection queue data. The project is proposed to connect to the grid at the Basin Electric 230 kV point of interconnection, with Basin Electric Power Cooperative (BEPC) identified as the associated utility.
The project is in the Southwest Power Pool (SPP) interconnection queue, where it holds an active status. It entered the queue on July 23, 2026, and has a proposed commercial operation date of December 3, 2029. The project has requested both Energy Resource (ER) and Network Resource (NR) interconnection service. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
ND
County
Oliver County
Grid Region
SPP (Southwest Power Pool)
Market
ISO/RTO Member
Developer
—
Utility
BEPC
Entity
SPP
Service Type
ER/NR
Point of Interconnection
Basin Electric 230 kV
Data Source
Live · SPP
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SPP
- Trading Hub
- SPP North Hub
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WAUE.BEPM.LOS1
- POI Substation
- Basin Electric Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project SPP-GEN-2026-SR33Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.