Project SPP-GEN-2026-SR33 — Project Summary

Queue ID
SPP-GEN-2026-SR33
Capacity
202 MW
Technology
Battery
Status
active
Location
Oliver County, ND
Region
SPP
Developer
—
IA Status
—

SPP-GEN-2026-SR33

SPP-GEN-2026-SR33BetaActiveBattery/StorageSPPLive · SPP

202 MW storage in Oliver County, ND · In queue since July 2026 · Proposed COD December 2029

BA: MISOISO/RTO: SPPNERC: MRORC: SPP

202 MW

Capacity

0

Components

3 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Pre-Study0%
Queue EntryJul 23, 2026

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-03

About

SPP-GEN-2026-SR33 is a proposed battery energy storage project located in Oliver County, North Dakota. The development project has a total capacity of 202 MW and is listed under the Battery/Storage technology category. No developer name or project name is available in the interconnection queue data. The project is proposed to connect to the grid at the Basin Electric 230 kV point of interconnection, with Basin Electric Power Cooperative (BEPC) identified as the associated utility.

The project is in the Southwest Power Pool (SPP) interconnection queue, where it holds an active status. It entered the queue on July 23, 2026, and has a proposed commercial operation date of December 3, 2029. The project has requested both Energy Resource (ER) and Network Resource (NR) interconnection service. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

ND

County

Oliver County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

BEPC

Entity

SPP

Service Type

ER/NR

Point of Interconnection

Basin Electric 230 kV

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
WAUE.BEPM.LOS1
POI Substation
Basin Electric Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2026-SR33
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.