Project SPP-GEN-2026-SR29 — Project Summary

Queue ID
SPP-GEN-2026-SR29
Capacity
196.56 MW
Technology
Battery
Status
active
Location
Thomas County, KS
Region
SPP
Developer
—
IA Status
—

SPP-GEN-2026-SR29

SPP-GEN-2026-SR29BetaActiveBattery/StorageSPPLive · SPP

196.56 MW storage in Thomas County, KS · In queue since June 2026 · Proposed COD October 2029

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

196.56 MW

Capacity

0

Components

4 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 4m

Pre-Study0%
Queue EntryJun 4, 2026

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

About

SPP-GEN-2026-SR29 is a proposed battery energy storage project located in Thomas County, Kansas, with a total capacity of 196.56 MW. The development project is within the Southwest Power Pool (SPP) region, and the associated transmission utility is Sunflower Electric Power Corporation (SUNC). The project would connect to the grid at the Mingo 115kV point of interconnection. No developer or project name has been publicly identified in the queue data.

The project entered the SPP interconnection queue on June 4, 2026, and holds an active status. It has requested Energy Resource (ER) interconnection service and has a proposed commercial operation date of October 1, 2029. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

KS

County

Thomas County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

SUNC

Entity

SPP

Service Type

ER

Point of Interconnection

Mingo 115kV

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
Mingo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2026-SR29
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.