Project SPP-GEN-2026-PR7 — Project Summary

Queue ID
SPP-GEN-2026-PR7
Capacity
39.76 MW
Technology
Wind
Status
active
Location
Brownell County, KS
Region
SPP
Developer
—
IA Status
—

SPP-GEN-2026-PR7

SPP-GEN-2026-PR7BetaActiveWindSPPLive · SPP

39.76 MW generation in Brownell County, KS · In queue since February 2026 · Proposed COD December 2027

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

39.76 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 10m

Pre-Study0%
Queue EntryFeb 28, 2026

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SPP-GEN-2026-PR7 is a proposed wind generation project with a total capacity of 39.76 MW, located in Brownell County, Kansas. The project is listed in the interconnection queue of the Southwest Power Pool (SPP), with MIDW identified as the associated transmission utility. The developer has not been publicly identified in the queue data.

The project entered the SPP interconnection queue on February 28, 2026, and currently holds an active status. It has requested Energy Resource (ER) interconnection service and proposes to connect to the grid at the South Hays 230 kV point of interconnection. Its proposed commercial operation date is December 1, 2027. The available queue data does not indicate the status of an interconnection agreement for the project.

---

*Note: Kansas has no county named "Brownell County," so the source data's county field may be incorrect. You may want to verify this before publishing.*

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • SPP queue source as of: Oct 22, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

KS

County

Brownell County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

MIDW

Entity

SPP

Service Type

ER

Point of Interconnection

South Hays 230kV

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP North Hub
Hub Confidence
HIGH
POI Substation
South Hays Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.