Project SPP-GEN-2026-PR19 — Project Summary

Queue ID
SPP-GEN-2026-PR19
Capacity
14.4 MW
Technology
Battery
Status
active
Location
Hobbs, NM
Region
SPP
Developer
—
IA Status
—

SPP-GEN-2026-PR19

SPP-GEN-2026-PR19BetaActiveBattery/StorageSPPLive · SPP

14.4 MW storage in Hobbs, NM · In queue since June 2026 · Proposed COD April 2026

BA: PNMISO/RTO: SPPNERC: WECCRC: RCW

14.4 MW

Capacity

0

Components

4 months

In Queue

—

IA Status

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 months

Schedule

7 months past proposed COD

Pre-Study0%
Queue EntryJun 18, 2026

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-04-10

About

SPP-GEN-2026-PR19 is a proposed 14.4 MW battery energy storage development project in New Mexico, with its location listed as Hobbs. The standalone storage project is in the generation interconnection queue of the Southwest Power Pool (SPP), within the service territory of Southwestern Public Service (SPS). It would connect to the grid at the Cunningham 115 kV point of interconnection. No developer is identified in the available queue data.

The project entered the SPP queue on June 18, 2026, and is listed with an active status. Its requested interconnection service type is NR (Network Resource). The proposed commercial operation date is April 10, 2026, which falls before the recorded queue entry date. The queue data does not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NM

County

Hobbs

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

SPS

Entity

SPP

Service Type

NR

Point of Interconnection

Cunningham 115kV

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
SPS.CUNHM1.SLR
POI Substation
Cunningham substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2026-PR19
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.