Project SPP-GEN-2026-PR17 — Project Summary

Queue ID
SPP-GEN-2026-PR17
Capacity
40.5 MW
Technology
Battery
Status
active
Location
Grady County, OK
Region
SPP
Developer
—
IA Status
—

SPP-GEN-2026-PR17

SPP-GEN-2026-PR17BetaActiveBattery/StorageSPPLive · SPP

40.5 MW storage in Grady County, OK · In queue since February 2026 · Proposed COD April 2025

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

40.5 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9 months

Schedule

20 months past proposed COD

Pre-Study0%
Queue EntryFeb 28, 2026

Interconnection request submitted to ISO/RTO

DISIS Study

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-04-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

SPP-GEN-2026-PR17 is a proposed battery energy storage development project in Grady County, Oklahoma, with a total capacity of 40.5 MW. The project is in the interconnection queue of the Southwest Power Pool (SPP), and the interconnecting utility is Oklahoma Gas and Electric (OGE). It would connect to the grid at the Minco 345kV Substation. The available data do not identify a developer or project name, so the project is referred to by its queue identifier.

The project entered the SPP queue on February 28, 2026, and its status is listed as active. It has requested Energy Resource (ER) interconnection service. The listed proposed commercial operation date is April 1, 2025, which is earlier than the queue entry date as reported in the queue data. No interconnection agreement status is reported, and the project is not linked to an existing operating plant in EIA records.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • SPP queue source as of: Oct 22, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OK

County

Grady County

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

OGE

Entity

SPP

Service Type

ER

Point of Interconnection

Minco 345kV Substation

Data Source

Live · SPP

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
OKGE.MNII.MNII
POI Substation
Minco Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.