Project SPP-GEN-2025-SR22 — Project Summary

Queue ID
SPP-GEN-2025-SR22
Capacity
100 MW
Technology
Other
Status
active
Location
Oklahoma, OK
Region
SPP
Developer
—
IA Status
IA Pending

SPP-GEN-2025-SR22

SPP-GEN-2025-SR22BetaActiveOtherSPPLBNL + Live

100 MW generation in Oklahoma, OK · In queue since June 2025 · Proposed COD November 2030

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

100 MW

Capacity

1

Components

Other

1y 4m

In Queue

IA Pending

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 5m

Study Phase

Surplus; 04 SOUTHEAST

In Study38%
Queue EntryJun 12, 2025

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

IA FULLY EXECUTED/ON SCHEDULE

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-11-30

About

SPP-GEN-2025-SR22 is a proposed 100 MW generation project located in Oklahoma County, Oklahoma, within the Southwest Power Pool (SPP) region. The project's technology is classified as "Other," with a single 100 MW component of the same designation. No developer or project name is identified in the available queue data. The proposed project would connect to the grid at the Horseshoe Lake 138kV Substation, in the service territory of utility OG&E.

The project entered the SPP interconnection queue on June 12, 2025, and holds an active status. It has requested Energy Resource Interconnection Service (ERIS), and its study phase is listed as "Surplus; 04 SOUTHEAST," indicating it is being evaluated through SPP's surplus interconnection service process. As of the latest data, its interconnection agreement is pending. The proposed commercial operation date is November 30, 2030.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OK

County

Oklahoma

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

OG&E

Entity

SPP

Service Type

ERIS

Point of Interconnection

Horseshoe Lake 138kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
HIGH
Nearest Node (Estimated)
OKGEHL8
POI Substation
Horseshoe Lake Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2025-SR22
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.