Project SPP-GEN-2025-GR1 — Project Summary

Queue ID
SPP-GEN-2025-GR1
Capacity
300 MW
Technology
Wind
Status
active
Location
Grant, OK
Region
SPP
Developer
—
IA Status
IA Pending

SPP-GEN-2025-GR1

SPP-GEN-2025-GR1BetaActiveWindSPPLBNL + Live

300 MW generation in Grant, OK · In queue since December 2024 · Proposed COD December 2026

BA: SWPPISO/RTO: SPPNERC: SPPRC: SPP

300 MW

Capacity

1

Components

Wind

1y 10m

In Queue

IA Pending

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 years

Study Phase

Replacement; 04 SOUTHEAST

In Study38%
Queue EntryDec 17, 2024

Interconnection request submitted to ISO/RTO

DISIS StudyCurrent

IA FULLY EXECUTED/ON SCHEDULE

SPP uses the Definitive Interconnection System Impact Study (DISIS) cluster process.

Typical: 36–48 months (improving)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-15

About

SPP-GEN-2025-GR1 is a proposed 300 MW wind generation project located in Grant County, Oklahoma. The development project is listed in the interconnection queue of the Southwest Power Pool (SPP) and would connect to the transmission system of OG&E at the OG&E Renfrow 345kV Substation, its designated point of interconnection. No developer has been publicly identified in the queue data. The project consists of a single wind component totaling 300 MW.

The project entered the SPP queue on December 17, 2024, and has a proposed commercial operation date of December 15, 2026. It remains in active status, and its interconnection agreement is pending. The project has requested Energy Resource Interconnection Service (ERIS) and is being evaluated in a study phase designated "Replacement; 04 SOUTHEAST," indicating it is being processed as a replacement request within SPP's southeast study area.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OK

County

Grant

Grid Region

SPP (Southwest Power Pool)

Market

ISO/RTO Member

Developer

—

Utility

OG&E

Entity

SPP

Service Type

ERIS

Point of Interconnection

OG&E Renfrow 345kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SPP
Trading Hub
SPP South Hub
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project SPP-GEN-2025-GR1
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.